Hyper App
Tashkent ma'lumotlar markazi β€” Faol

Ma'lumotlaringiz shu yerda saqlanyapti.

Tier III sertifikatlangan. Uzbekiston suveren. Doim yoniq.

Location

Tashkent, Uzbekistan

Hyper App Data Center

Tashkent, Republic of Uzbekistan

41.2995Β° N, 69.2401Β° E

Tashkent, UZ

Data never leaves Uzbekistan. All infrastructure is fully compliant with Uzbekistan's Law 213 on personal data localization.

Tier III sertifikati

Quvvat va sovutish zaxirasi

213-sonli Qonunga muvofiq

Ma'lumotlar Uzbekistonda qoladi

Mintaqada 5 ms dan kam

Tashkent tugunlarigacha

99.999% ishlash vaqti

Shartnomaviy SLA

2N

2N quvvat zaxirasi

N+1

N+1 sovutish tizimlari

10 Gbps

10 Gbps uplinklar

24/7

24/7 joyida xavfsizlik

Infrastructure detail

Built for zero tolerance

Power

  • 2N redundant power supply (two independent paths)
  • On-site diesel generators β€” full capacity backup
  • UPS systems with instant failover (<10ms switchover)
  • Dedicated substations from two independent grid feeds

β€œIf the city power goes out, your servers don't even notice. Two separate power paths feed every rack.”

Cooling

  • N+1 precision air conditioning β€” one unit always redundant
  • Hot/cold aisle containment for maximum efficiency
  • Temperature monitored every 30 seconds at rack level
  • Water-free cooling β€” no flood risk

β€œServers overheat when cooling fails. We maintain N+1 cooling so one failed unit never causes a problem.”

Physical Security

  • 24/7 armed on-site security personnel
  • Biometric access control β€” every zone logged
  • Full CCTV coverage with 90-day retention
  • Mantrap entry β€” two-door controlled access

β€œYour data is behind physical barriers that most banks would approve. No unauthorized person gets near the hardware.”

Certifications & Compliance

ISO 27001Tier IIILaw 213 / UzbekistanGDPR-Ready⏳SOC 2(in progress)

Enterprise & Banking

See it with your own eyes

We invite enterprise clients and their compliance teams to tour our facility. Walk the floor, meet the team, inspect the hardware. No PowerPoint slides β€” the real thing.

Guided tour of the live data center floor
Meeting with our CTO and infrastructure team
Compliance documentation package provided
Custom SLA discussion for your requirements